Timberlands Pacific – Timber Bridge Replacement Program

Putting Giraffe Civil Contracting’s experience, civil engineering and forestry knowledge, we have built a great relationship with Timberlands Pacific in the removal of old timber bridges to then fabricate and install new counter levered concrete bridges designed by Giraffe Civil Contracting, certified by Dale Luck & Associates.

Timberlands have replaced over 12 expired timber bridges with existing load limits in the past 3 years with this steel and concrete design.

 

ba70fab0-a163-47db-8cb3-eda93289e253-original79a326e6-5399-4dab-9891-80a295944eea-original76ccecf5-7048-4929-85ff-7a9e2d0ffaa6-original6d0cb1dd-6cd2-47bf-bfda-051497abd02f-original0cb95284-4452-44b7-880b-cc5f493f6b7d-original

IMG_0058IMG_0056IMG_0053IMG_0042IMG_0043IMG_0012IMG_0011

 

Advertisement